El Cerrito Del Norte Transit-Oriented Development (TOD) Complete Streets

Construction of curbs, gutters, sidewalks, pedestrian ramps, street lights, traffic signals, drainage, seal coat, striping, landscaping, and irrigation as shown on the Plans, as called for in the Specifications, and as directed by the Engineer.
Addendum 1 (click to expand/collapse)