2025 Access Modification Project, C3024.8
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; AC Conform Paving, AC plug paving; concrete removals, new concrete sidewalk, curb ramp curb and gutter, driveway, topsoil and mulch, tree removal and new tree planting, sign and post installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Accepting Bids
Prebid Date | 7/22/25 1:00pm |
Bid Date | 7/31/25 2:00pm |
Location
City of El Cerrito
The Engineer’s estimate for construction is approximately $622,000 Base Bid.
A non-mandatory pre-bid conference will be held at 1:00 p.m., on Tuesday, July 22, 2025, at the El Cerrito City Hall, 10890 San Pablo Avenue, El Cerrito, California, 94530.