2025 Access Modification Project, C3024.8
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; AC Conform Paving, AC plug paving; concrete removals, new concrete sidewalk, curb ramp curb and gutter, driveway, topsoil and mulch, tree removal and new tree planting, sign and post installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Specifications
(click to expand/collapse)

Name | Size | ||
2025 Access Mod Proj - Specs Final 7-8-25 | 842.9 KB |