2025 Access Modification Project, C3024.8
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; AC Conform Paving, AC plug paving; concrete removals, new concrete sidewalk, curb ramp curb and gutter, driveway, topsoil and mulch, tree removal and new tree planting, sign and post installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Plan Holders
Date | Company | Contact |
7/9/25 8:18 am |
Bay Area Builders Exchange
3055 Alvarado Street
San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
7/9/25 8:18 am |
Construction Bidboard, Inc.
11622 El Camino Real # 100
San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
7/9/25 8:18 am |
Marin Builders Exchange
660 Las Gallinas Avenue
San Rafael, CA 94903 |
000 Plan Room
Tel: 415-462-1220
|
7/9/25 8:18 am |
Peninsula Builders Exchange
735 Industrial Road
San Carlos, CA 94070 |
000 Plan Room
Tel: (650) 591-4486
|
7/9/25 8:18 am |
Reed Construction Data
30 Technology Pkwy S., Ste 500
Norcross, GA 30092 |
Plan Room
Tel: 800-876-4045
|
7/9/25 8:18 am |
San Francisco Builder's Exchange
850 South Van Ness Ave.
San Francisco, CA 94110 |
Deanna Johnson
Tel: 415-282-8220
|
7/9/25 8:18 am |
Valley Contractors Exchange
951 8th ST.
Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|
7/10/25 9:46 am |
Villalobos and Associates Inc.
645 RUCKER AVE
GILROY, CA 95020 |
Emiliano Villalobos
Vice President
Tel: (669) 294-1903
Fax: +1 (408) 843-8178
|